Gold Member Since 2014
Audited Supplier
Hangzhou Lectstyle Trade Co., Ltd.

Permanent Magnet Motor, Wind Turbine, Magnet Wind Generator manufacturer / supplier in China, offering 600W Low Rpm Permanent Magnet Alternator for Wind Generator Use, 05b Roller Chain Made by Alloy Steel, 16b-2 Sharp Top Chain with Stock Sprockets and so on.

(/ )

Supplier Homepage Product WIND GENERATORS Permanent Magnet Generator 600W Low Rpm Permanent Magnet Alternator for Wind Generator Use

600W Low Rpm Permanent Magnet Alternator for Wind Generator Use

Purchase Qty.:
(Pieces)
1 2-4 5+
FOB Unit Price: US $195 US $190 US $185
Purchase Qty. (Pieces) FOB Unit Price
1 US $195
2-4 US $190
5+ US $185
Get Latest Price
Production Capacity: 10000 PCS Each Month
Transport Package: Plywood Case
Payment Terms: T/T, Western Union, Money Gram

Request a custom order and have something just for you!

Send Customized Request
Basic Info
  • Output Type: DC
  • Rated Power: 600W
  • Rated Voltage: 12V or 24V
  • Output Current: AC
  • Protection Grade: IP54
  • Certificates: Ce, ISO9001, TUV
  • Specification: ISO, G/B
  • HS Code: 85016100
  • Type: Wind Power Generator
  • Max Power: 636W
  • Rated Rotated Speed: 600rpm/3000rpm
  • Permanent Magnet Material: Rare Earth NdFeB
  • Lubrication: Lubrication Grease
  • Trademark: LECTSTYLE
  • Origin: China
Product Description
600w Low Rpm Permanent Magnet Alternator for Wind Generator Use Features:
 
low rpm permanent magnet generator 
aluminium alloy shell 
low start-up torque 
direct drive 
CE certified
600w Low Rpm Permanent Magnet Alternator for Wind Generator Use technical data:
 
Rated Power(w)600w
Max Power(w)636w
Rated Voltage(v)12/24/48v
Rated rotated speed(r/m)600r/m
Top net weight(kg)6.3kg
Output CurrentAC
Start Torque0.52Nm
generator3 phase permanent magnet synchronous generator
Insulation Class:F
Service Life:More Than 20 years
BearingHRB or for your order
Shaft Materialstainless steel
Shell Materialaluminium alloy
Permanent Magnet MaterialRare Earth NdFeB
Protection GradeIP54
LubricationLubrication Grease
Working temperature-40ºC - 80 ºC
FAQ:
1.Why are your prices so low, are these quality items and brand new? 
We sell brand new items directly from factory in Asia. That is why our prices are so competitive.
To maintain quality control ,we do personally inspect for each item prior to shipment. All items are 100% new and inspected.
 
2. What kind of region can be installed wind turbine?
Small wind turbines should be applied in the regions which wind reso urces is sufficient. The annual average wind speed should be more than 3m/s, the effective wind speed 3-20m/s should be more than 3000h in accumulation per year. The density of 3-20m/s effectively average wind power should be more than 100W/m^2

It should be noted that choosing the rated design speed wind turbine is in conformity with local design speed. It is significantly in making use of wind resources and in economic aspect. Wind tunnel test proves that the fan power transformation of the impeller in the direct ratio with wind speed, that is to say, the wind speed decide the output electrical power.

Our Service
 
1. We will give positive feedbacks to our customers when we receive the payment released by Aliexpress system. So hope you also can leave positive feedbacks to our service. If you are not satified with our products or service, you also can contact with us directly. We are welcome you to give our your precious suggestions.
 
2. All message and emails will be answered within 1 business day. If you do not receive our reply please kindly re-sent your message or emails and we will reply to you as soon as possible.
 
3. Before placing your order, please leave the key parameters to us so that we can prepare the products to you ASAP to short the delivery time. Our after sales service also keep tracking it and send message to you when there is any delay in shipping. 
4.When you receive the package, please open the package and check all the items are working in good condition before you sign.Don't sign if the items are broken,and ask the delivery company to make a "damage certificate" Otherwise,we will not provide any warranty and refund.

Payment & Delivery
Payment termsT/T
 
EXW30% In advance, 70% before delivery
 
FOB
CFR/C&F30% In advance, 70% against copy of B/L
CIF
L/CTotal amount above USD50,000, we accept L/C at sight
West UnionTotal amount less than USD5,000
PayPal
Delivery time15-20 working days after receiving down payment for one container


Our full production process strictly adhered to the ISO9001 quality control system, our higher quality , advanced equipment and technology ensure a guarantee in leakage-proof , retention and   duration !
Your OEM orders are also warmly welcomed, it is our commitment to satisfy your requirement, please turst that we will be your reliable business partner for our good reputation,good quality and competitive price !
Send your message to this supplier
Avatar
Mr. Harry.Rao
Sale Supervisor
*From:
To: Mr. Harry.Rao
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now